Abstract. The paper describes results of technical-and-economical comparison of some transportation system options for apatite-nepheline haulage from the Partomchorr deposit to the "Oleni Ruchei" processing plant. The reasonable mining-and-transportation system considering mining-and-geological characteristic of the area has been introduced.
Keywords: deposit, mining-and-transport system, tunnel, railway, conveyer, electric locomotive, capital expenses, operating expenses, producing costs
Printed reference: // Vestnik of MSTU. 2011. V. 14, No 4. P. 784-788.
Electronic reference: // Vestnik of MSTU. 2011. V. 14, No 4. P. 784-788. URL: https://vestnik.mauniver.ru/v14_4_n46/articles/784_788_gromov.pdf.
The editorial board of the "MSTU Vestnik" journal supports the «Open Access» policy which enables users to have free and unlimited access to scientific articles (to read, download, copy, distribute) in case the author is indicated when further quoted.